Introduction
We know Basecamp as a software company building innovative approaches to work. The company introduced “Shape Up” in 2018 by Ryan Singer, Basecamp’s Head of Strategy, as an alternative to traditional agile methodologies.
It originates from Basecamp’s own experiences and need for a more focused approach to product development.
The free online book “Shape Up: Stop Running in Circles and Ship Work that Matters” describes the methodology in detail.
Key Steps
You’ll find 4 steps to shape up your projects:
- Shaping: Defining and outlining potential projects
- Betting: Deciding which shaped projects to pursue
- Building: Six-week cycle of focused development
- Cool-down: Two-week period for reflection and preparation
Let’s dive in more detail about each step.
1. Shaping
We call Shaping the initial phase when the team defines projects at a high level. It includes outlining the problem and solution, setting boundaries, identifying risks, and determining the appropriate time investment or “appetite.”
What Shaping Includes and Doesn’t Include
It includes a high-level problem definition, solution outlines, rough sketches, risk identification. However, you should go into detailed specifications, pixel-perfect designs, comprehensive feature lists, precise time estimates.
Completion Criteria
Shaping is complete when the work is “shaped”—e.g. well-defined but flexible, with clear boundaries and identified risks, ready for the betting phase.
2. Betting
In the betting phase, stakeholders review shaped work and decide which projects to pursue in the upcoming cycle.
How Is the Betting Process Organized
First, the senior leadership bet on the shaped projects. It occurs before each six-week cycle, at the cool down phase, described below.
It’s about decision making: projects are fully committed to or not at all, based on potential impact and available resources. Non-selected projects enter the pool for the next betting phase or might even be reshaped based on the feedback gathered during a cycle.
Finally, the leadership assigns small teams on bet-on projects.
3. Building
The building phase is a six-week cycle where teams work autonomously to complete their assigned projects.
Building Process and Best Practices
Small, autonomous teams work without interruption.
The team visualizes progress using “hill charts”.
Source: from basecamp-help.com
The team actively manages scope through “scope hammering”. The principle comes down to take out what isn’t essential. See below about “Scope Cutting Limits”.
No daily stand-up occurs and communication is asynchronous.
Shipping complete projects is the focus of the team, albeit potentially reduced in functionality.
QA During Building
The team integrates QA throughout the development process.
The methods used include the well-know methods: TDD, pair programming, automated testing, continuous integration, manual and exploratory testing.
Scope Cutting Limits
Cutting out must preserve core value and problem-solving capability.
It shouldn’t compromise user experience or technical viability.
Also, cuts shouldn’t prevent future extensibility or undermine business goals
4. Cool-down and Cycle Completion
After the six-week cycle, there’s typically a two-week cooldown period for reflection, bug fixes, and planning.
The team ships completed work to the customer(s).
The team evaluates the project outcomes and it may not complete unfinished work. It really depends on the next shaping phase.
Also, lessons learned are applied to future shaping and betting and the team prepares for the next cycle to begin.
Conclusion
What do you think about the Shape Up methodology?
I like the commitment to the selected projects while building and give accountability to build the best product with the key shaping information in a relatively long period. In total, you have 8 weeks to complete a cycle and that seems enough to bring value and quality to a product.
I can’t wait to try it out.